What to expect

What Happens on Removal Day

If you’ve never had asbestos removed before, the unknown is the stressful part. So here’s the whole thing, start to finish — no jargon, no surprises.

  • Licensed AD214755
  • Fully Insured
  • SafeWork Compliant
  • Disposal Dockets Provided
CM3 Certified — contractor WHS prequalification

Certified

WHS prequalified · ID 97024

Before the day

The Groundwork You Don’t Have to Worry About

By the time the crew arrives, the important work is already done. We’ve assessed the job — on site or from your photos — confirmed the material is bonded, and given you a fixed, itemised quote. Where the job is notifiable, we’ve lodged the Form 65 with SafeWork NSW (minimum five calendar days’ notice for Class B). You don’t deal with the regulator, the paperwork or the planning — that’s our job.

On the day

Step by Step, From Arrival to Hand-Back

  1. 1

    Arrival & set-up

    The crew arrives at the agreed time, walks the site with you, and sets up. Access is planned, surrounding areas are protected, and everyone knows the plan before anything is touched.

  2. 2

    The exclusion zone

    A controlled work area is isolated so the job is contained and the rest of your property stays usable. You’re kept clear of the zone while the crew works inside it.

  3. 3

    Controlled removal

    Bonded sheeting is removed carefully by hand wherever possible — never dry power-cut, which is what sends fibres airborne. Dust is suppressed and the material is kept intact as it comes down.

  4. 4

    Double-wrapping & labelling

    Every piece is double-wrapped in heavy plastic and labelled as asbestos waste on site, ready for lawful transport — no loose material, no open loads.

  5. 5

    Load-out & clean-down

    The wrapped waste is loaded for disposal and the work area is cleaned down. What’s left is a tidy site, not a mess for you to deal with.

  6. 6

    Disposal & documentation

    The waste goes to an EPA-licensed facility, and you receive disposal dockets — plus an independent clearance certificate where the job requires one.

After the day

What You’re Left With

A clean, cleared area — and a paper trail. You get your disposal dockets proving the waste went to a licensed facility, and, where the job requires it, an independent clearance certificate confirming the area is safe to reoccupy. That documentation is what satisfies councils, insurers and future buyers — so the job’s not just done, it’s provable.

One accountable contractor, from the first photo to the final docket. That’s the whole point: you shouldn’t have to project-manage your own asbestos removal.

What our clients say

Trusted Across Sydney

“We used HazWreck for a commercial strip-out and demolition at our World Gym, carried out overnight while the gym stayed operational. The crew were professional, clean and completely unobtrusive — management and members didn’t even know they’d been there. They later handled an urgent asbestos and demolition job for us at a private school in Auburn at very short notice, in and out with zero fuss. Reliable, licensed and easy to deal with. Highly recommended.”
Ertac Turk World Gym
“I’ve used HazWreck across multiple projects — two full house demolitions in Auburn and Lidcombe, a commercial strip-out in Penrith, and ongoing site clean-ups. As a residential builder, having one contractor who can handle demolition, asbestos and site clearance under one roof saves me a huge amount of coordination and time. Baris and the team are professional, reliable and always hand the site back clean and ready to build on. Couldn’t be happier with the service.”
George Residential Builder
“As a commercial and residential builder I’ve used HazWreck on multiple projects and they’ve been excellent throughout. They handled a complete strip-out of a house in Carlton for me, and most recently a commercial asbestos strip-out and demolition at Strathfield Plaza. Having one licensed contractor who can take care of asbestos, strip-outs and demolition across both my resi and commercial sites makes my life so much easier. Professional, reliable and clean every time — couldn’t recommend them more.”
Sam Commercial & Residential Builder

Common worries

The Questions Everyone Asks

How long does asbestos removal take?

Many residential jobs — a fence, a garage roof, a small strip-out — are completed in a single day on site. Larger roofs or full strip-outs can take longer. The removal itself is usually quicker than people expect; the timeline is mostly shaped by the Form 65 notice period (minimum five calendar days for Class B) beforehand. We give you a clear timeframe with your fixed quote.

Do I need to move out during asbestos removal?

For most bonded (Class B) jobs, no. We set up a controlled exclusion zone around the work area so the rest of the property stays usable, and we keep you clear of that zone while the crew works. For larger jobs we’ll talk you through any access arrangements up front so there are no surprises on the day.

Is it safe to have asbestos removed while I’m home?

Bonded asbestos is removed using controlled methods — an isolated work area, dust suppression, careful hand removal rather than dry power-cutting, and immediate double-wrapping. Those controls are exactly what keeps fibres contained. You stay out of the exclusion zone, the crew works to NSW WHS Regulations, and the area is cleaned and (where required) independently cleared before it’s handed back.

Get a free fixed quote

Know Exactly What to Expect

Send a few photos and your address and we’ll come back with a clear, fixed quote — and walk you through exactly what your job involves before we start.

HazWreck Pty Ltd

Unit 33A, 11-21 Underwood Rd, Homebush NSW 2140

0418 882 285 · info@hazwreck.com.au

SafeWork NSW Class B Licence AD214755 · ABN 63 688 823 789

How soon do you need it?

Your information is 100% safe and secure. Licensed, insured, fixed price.

Call Now Get a Free Quote